Draft systems & serving
Kegerator Setup Wizard
Turn your setup idea into a practical checklist.
Plan the cold space, keg connections, gas supply and beer path. Leave with a list of component roles, planned quantities and specifications still to confirm.
See the scope & planning assumptionsWhat you will serve
What gas and beer service are you planning?
Not selected yet? Keep it unresolved. The plan will identify what information you need.
Your setup plan
Need or verify
These are component roles, not a product-specific shopping cart. Quantities assume one dedicated faucet and beer run per connected keg. Supplied assemblies may already include several listed roles.
| Component role | Planned quantity | Specification to confirm |
|---|
Specifications still unresolved
All choices on this route are recorded without an unresolved answer. Exact products, measurements and commissioning still require verification.
What this plan does not approve
Before the first pour
Carry out the applicable checks using the equipment and cleaner instructions. This list does not mark them complete or authorise operation.
Your choice record
These are your supplied choices, not independently checked product data. Changing a choice clears later responses.
No choices recorded.
Planning references
Franklinbrew · Kegerator Setup Wizard v1.0 · Reviewed 17 November 2026. Choices stay in page memory and disappear on reload or close. Print/save a plan to keep it.
Behind the plan
Match the system.
Confirm the details.
Useful component categories, with the unknowns kept visible.
What version 1 covers
Conventional pure-CO₂ beer, a small refrigerated direct-draw installation and 1–4 simultaneously connected kegs, each with a dedicated faucet. Nitro/mixed gas, cask, remote/pumped runs, larger and shared-tap designs need another planning route.
Keg family is not the whole connection
Ball-lock and pin-lock plans list separate gas and liquid disconnects. A commercial coupler is named only after you select a supplier-confirmed valve system. A mixed or unknown keg family leaves connector selection unresolved.
The exact coupler/disconnect outlets, line fittings, threads, seals and tubing dimensions still require product documentation. No beer-brand lookup, colour assumption or automatic adapter recommendation is used.
Multiple kegs do not always share one pressure
A common-pressure distributor can serve beers with a checked common holding target. Different targets need an appropriately regulated branch arrangement. A manifold splits an already regulated supply; it does not create independently controlled pressures.
The plan describes needed control roles, not the exact number of regulator bodies or a supply-pressure setting. Gauges are not the same thing as independently regulated outputs.
Fit and cooling need the real cabinet
Check actual keg dimensions with couplers/disconnects, hose bends, door/lid movement, service access and required cabinet ventilation. For a tower, include the path to the faucet in the cooling design.
Factory openings and documented modification routes are different from a generic suggestion to drill a door or roof. This tool does not locate hidden services or declare a drilling point safe. Known mounting, fit, cooling or fitting conflicts put the plan on hold.
Unresolved choices and completed plans
A blank answer stays unanswered; unknown stays unresolved. Component quantities remain TBD when serving count is unknown. You can request a partial plan, go back or edit an earlier choice. Changing it clears later responses.
Even a complete plan is only ready for review. It does not confirm gas suitability, hardware ratings, leak testing, hygiene or a measured first pour. Follow the exact supplier instructions, including local cylinder/refill requirements.
Sources & review
Reviewed 17 November 2026 · Version 1.0. Source-based planning rules and software checks; no physical installation or product-level compatibility certification.